Total area: 68,000 square meters
Building area: 59,000 square meters
Container houses: 2,560 flat pack container houses
Cables: 65,000 meters
Steel pipes: 45,000 square meters
Water pipes: 30,000 meters
Number of participants: nearly 13,000 people
Construction time: completed in 20 days
Functional zoning
Including treatment rooms, inpatient wards, intensive care units (ICUs), operating rooms, professional departments (MRI, CT, X-ray and ultrasound equipment), laboratories, disinfection rooms, sterile rooms, biohazard rooms, etc.
Including nurse stations, lounges, pharmacies, bathrooms, self-service operation headquarters, security monitoring rooms, etc.
Design concept and features
Adopt container modular design, standardized production, and fast on-site assembly to meet emergency needs.
Designed in strict accordance with the standards of infectious disease hospitals, with clear divisions and reasonable flow lines to reduce cross-infection.
Considering the needs of patients and medical staff, rest areas, lighting courtyards, video call facilities, etc. are set up to improve comfort.
Building materials can be recycled, and the design takes into account multi-purpose use after the epidemic.
Technology and construction
Adopt raft foundation, and overhead steel beams connect containers to ensure structural stability.
The upper structure adopts prefabricated steel structure, and some special function rooms (such as CT rooms) adopt plate steel structure.
Under the background of the epidemic, optimize the construction process, ensure the safety of personnel, and complete the construction quickly.